waterline logo great finishes start at the waterline

The Online Form below is also available in WORD format.

2007–2008 Winter Storage Contract

Yacht Owner

Yacht Name

Street Address

City

State

Zip

Business Tel

Home Tel

Email

Fax

Combo Key

Boat Make

LOA*

Boat Year

Arrival Date

Departure Date

*LOA includes bowsprits, swim platforms, and any other non-removable appendages.

 

2007–2008 Winter Storage Rates
(includes Summer storage of cradle or boat trailer if applicable.

 

WORK REQUESTED

PRICE

LOA

TOTAL PRICE

Outside Storage (Includes Haul, Wash, Blocking, Launch)

$42/loa

Indoor Storage (Includes Haul, Wash, Blocking, Launch)
Does not include Transportation Fees**

$10/sq ft
L xW

On Trailer Storage (boats less than 30 ft loa)

$25/loa

Outside Rack Mast Storage (if disassembly required – billed t&m)

$5/ft

Inside Mast Storage (if disassembly required – billed t&m)

$8/ft

SUB TOTAL

 

2007–2008 Winter Service Rates

 

WORK REQUESTED

PRICE

#

TOTAL PRICE

NO WINTERIZATION

N/A

N/A

Engine Winterization – 4 Cylinder and Generators

$320

Engine Winterization – 6 and 8 Cylinder

$350

Engine Commissioning – 4 Cylinder and Generators

$272

Engine Commissioning – 6 and 8 Cylinder

$340

Engine oil/filter & fuel filter change (sailboats/gensets only)

T&M

Engine oil/filter & fuel filter change (motor yachts)

T&M

Change Fuel Water Separator Filter

T&M

Outdrives (remove, store, lube oil change, reinstall)

T&M

Battery Storage (remove, maintenance, test, reinstall)

$85/ea

Fresh Water System (water tanks empty)

T&M

Heads (if holding tank empty)

$68/ea

Bilge Pumps (electric or manual)

$68/ea

Mast – Unstep/Step (machinery fee per boat foot – round-trip)

$15/ft

Mast Disassembly in Fall
*All sails and exterior canvas must be removed prior to haul

T&M

Mast Assembly in Spring

T&M

Rig Tuning

T&M

Shrink-Wrapping (Includes vents, door, and removal)

$21/loa

Shrink-Wrap Recycling

$1/ft

Hull Waxing in Spring

T&M

Interior Detailing

T&M

Deck Washing

T&M

Transport from Marina to Indoor Storage Facility

TBD

Labor – Yard, paint work

$70/hr

Labor – Mechanical, electrical, plumbing, carpentry

$75/hr

Actual materials used to complete work will be invoiced accordingly – SUB TOTAL

Winter Storage Services will be Invoiced and Due upon the completion of the work

 

I accept the terms and conditions as provided in this storage agreement for 2007-2008 with a 100% payment of the storage fee. I understand that no boat will be hauled until Waterline Systems has received a completed, signed contract with payment in full. I understand that no boat will be launched without final balance paid in full. A launch date and keys or combination are required with this contract. Click here for Rules and Regulations.

 

Signature

Date

Please contact Waterline Systems for payment options – Telephone 401 682 1661 –
or mail a completed Winter Storage Contract with check to the address listed below.
Please make checks payable to Waterline Systems LLC.

 

Please send a detailed estimate for:

Topside Paint

Bottom Painting

Grand Prix Bottom Finishing

Rigging Upgrades

Engine Overhaul

Bright Work Refinishing

 

Additional Comments: